Checklist

Know pass or fail before you close the wall

Required versus available volume, spare cubic inches, and a stop rule before drywall.

Pass versus overfill box volume stacks
  1. Sum required cubic inches for conductors, clamps, fittings, devices, and grounds.
  2. Confirm box volume from Table 314.16(A) or the stamp.
  3. Compute spare (box minus required). Negative spare means fail.
  4. If it fails, upsize the box or add a listed ring before trim-out.
  5. Record the edition you used.

Calculates box fill per the selected NEC edition. Local amendments may differ. Verify with your AHJ or inspector.